Clientele

  • Print
  • E-mail

ΒΙΟΜΕΚ ABEE has supplied their products to the following customers :

  • Public Power Corporation (PPC)
    (more than 25.000 tn of towers for power transmission lines)

  • Greek Railway (OSE)
    (2.000 pcs of masts for railway Athens-Thessaloniki electrification and 101 Pylons of height from 15m until 35m for the GSMR antennas of OSE from KIATO to PROMAXONAS.)

  • Athens Suburban Railway with 6000 poles 8 to 10m and 1500 tons of portal structures. (ALSTOM Transport)

  • J/V Attiki Odos Highway– Exclusive Supplier
    (7.000 pcs of poles for Highway lighting, 8 to 15 m and 150 pcs masts with movable head of 30m and 35m height)

  • Egnatia Highway and PA-THE Highway with poles for Highway lighting

  • Athens New Hippodrome with 27 masts of 35 m and up to 80 floodlights

  • Olympic Hippodrome Center with 4 masts of 45 m and up to 96 floodlights

  • Volos Olympic Stadium with masts of 52m with 96 floodlights

  • Airports El. Venizelos, Macedonia, Kastoria, Heraklion, Santorini, Araxos, Aktio with movable head masts and street lighting poles

  • Municipalities of Athens, Pireus, Renti, Zografou, Kalamatas, Corfu, Kozani Katerini, Ioanina, Livadia, Heraklion, Rethimno e.t.c.

  • Ports of Pireus, Heraklion e.t.c..

  • Construction companies : AKTOR SA, ALSTOM TRANSPORT SA-PANTEXNIKI SA, J&P-ΑVΑX SA, TERNA SA, SIEMENS SA, MICHANIKI SA, MOXLOS SA, ATHINA SA, EMBEDOS SA, TEMKA SA, METKA SA, BIOKAT SA, TECNODOMIKI SA, TOMH SA, HELLENIC PIPE MILL SA, PIPE MILL OF THIVA SA, LARKO SA, PIPE MILL OF CORINT SA, ELVAL SA, ELEFSIS SHIPYARDS, SKARAMANGA SHIPYARDS.

    as well as a large number of other companies all over Greece.

2004 Athens Olympic Games

BIOMEK ABEE offers to the market the optimum combination of quality, and price with reference to the high masts for stadiums lighting.

This is the reason that they supplied 148 pcs high masts to lighten 19 Olympic Stadiums during the Athens 2004 Olympic Games. 

All the competent contractors entrusted to us their supplies due to our reliability, the technical support even at the design stage the small delivery time and the execution of the installation by our personnel even for the very big masts (56 m focus height).